Milwaukee Bridge (aka Veterans Bridge) Rehabilitation

Project Summary (see below for updates)

The Milwaukee Bridge spans the Puyallup River at Milwaukee Ave. NE and NE 5th St.

In 2012, this cast-in-place concrete structure was projected to provide about ten more years of use. Either the bridge must be rehabilitated at this time, using existing components, or its condition will continue to deterioriate to the point of non-use (i.e. permanent closure).

In order to preserve this valued access across the river, the City sought funding from the Federal Highway Administration and was awarded an 80% cost share grant up to $11,500,000.

This project is expected to go out to bid in 2019, with construction in 2019/2020.

Milwaukee Bridge

Why is this work needed?

According to a report issued in 2013, Veterans Bridge (formerly known as the Milwaukee Bridge) is failing.

We know this because all bridges used for public transport must be inspected every two years by a certified inspector.* An inspection assesses the overall condition of a bridge and determines a Sufficiency Rating, which ranges from 100 (best) to zero (worst).

  • Veterans Bridge currently has a sufficiency rating of 15.32.
  • The bridge is now categorized as Structurally Deficient.

Structural deficiency can occur when a bridge does not meet operating load requirements or has superstructure or substructure condition deficiencies. The superstructure rating of Veterans Bridge is “4” which is considered to be “Poor Condition.” Typical of this condition are advanced deficiencies such as section loss, deterioration, cracking, spalling and scour.

Due to concerns about the state of its structure, Veterans Bridge was first posted with load restrictions in 2009. Those restrictions were tightened in the fall of 2018.

  • Veterans Bridge averages about 10,000 vehicle trips per day.
  • The number of daily vehicle trips is projected to rise to 23,927 by 2032.

In 2012, the lifespan of the bridge was projected to be about ten years. It must either be replaced or rehabilitated, and there is not sufficient funding available at this time to replace it.

This type of infrastructure deterioration is happening all across our country. Very recently, commuters on I-91 in Massachusetts encountered chunks of concrete in the road—debris from a failed bridge joint. Here in Puyallup, we’re fortunate to have caught this problem before the condition of Veterans Bridge proceeded to critical or, even worse, imminent failure.

*Due to its current substandard condition, Veterans Bridge has been inspected every year since 2009

Updates

May 2019 Update:

All of the necessary property rights have been acquired for this project. The City has submitted for the required shoreline permit, which remains in process. Bid documents are nearing completion and the project may go out to bid as early as July.

If bid results are within budget, the project will be awarded and begin construction. The anticipated time for construction is 365 working days (approximately 18 months).

The bridge will be closed during construction. All cross-river traffic including from Benston Road will be detoured to Meridian.

November/December 2016 Update:
The City will seek a boundary line adjustment so that the entire project on the north side of the bridge will be within Puyallup's city limits.

The City is also reviewing the total costs for the project to determine if it will request an increase to the original grant amount.

October 2016 Update:
This project is under design. The biological assessment, which addresses flood plains and Endangered Species Act impacts, has been completed and will be reviewed before permits are submitted.

The design for the replacement structure addressed components such as sight distances, utility relocations, right-of-way needs and structural layout. The three current south approach spans will be consolidated and replaced with one approach span.